• Phone +39 080 748840

    Fax. +39 080 4135392

  • Via San Donato, 80

    70043 Monopoli (BA) IT

  • info@ldmontaggi.it

    E-mail address

STADLER BUSSNANG BOLZANO

It has performed at the IMC Trenitalia deposit in Bolzano, activities of imperial restoration of damaged ETR carriage.

STADLER BUSSNANG SERMIDE

It ‘s engaged in welding on the workings of damaged column between the two windows at the TPER yard in Sermide.

HITACHI RAIL ITALY S.P.A.

Currently engaged c / o the yard of AnsaldoBreda Spa (HITACHI RAIL ITALY S.P.A) of Pistoia, for assembly work, mechanics, body shop and carpentry of convoys:

  • ETR1000 : drilling case and application inserts, painting doors of the cab and bench, assembling welded parts imperial application pictograms, Dime, painting loose parts.
  • TSR : doors assembly, welding (assembling imperial interventions), the paint shop work, mechanical assembly (repulsion traction)
  • IC4 : touches of paint shop
  • VIVALTO : construction, finishing touches of painting
  • EXPO’ : repairs and painting
  • ETR 500 : Restore mounting “curmudgeon”
Questo sito utilizza cookie. Navigando sul nostro sito accetti l'informativa sulla Privacy e sull'utilizzo dei cookie. Maggiori informazioni sull'utilizzo dei nostri cookie al seguente link   Preferenze cookie .
×